This needs to be the year in having all panels fully fitted aligned and gaped with primer on. Headlight plugs finished and made.


March 30  1hr
Re-assessed upper window trim mold/plug. As it was kind of made blind, meaning never checked on how thick the build up was while making the plug. The front edge though its spot on the corner, the very edge by the glass is rather wavy. So figured rather then having it one ugly thing its best to have it corrected and build up the plug before pulling the part out of it. Unfortunately will have to build up considerable amount on left inside and slightly remove some on the right which will need to have some of the plug ground up and remade then have it skimmed over on the inside in order to make it smooth

April 20  0.5hr
Sanded down on the body filler that was put on the upper windshield trim and filled in with softer plaster as to make sanding easier

May 5  0.5hr
had the upper windshield trim plug filling sanded down and primed. Will need bit some more work before its ready for making part.

May 20  3hr
filled in and build up upper windshield form for making part. Started enlarging holes and preparing bolts for sill panel trim. Bolts will need to be shortened for clearance purposes before they are bonded in

May 31 1hr
sanded down windshield upper trim and primed

Jun 1 
filled in valleys in windshield trim

Jun 16 3hr
Trimmed bolts on the sill panel's trims and bonded in. Sanded in windshield and primed

Jun 29  0.5hr
Accidentally bumped the windshield mold and cracked of part of the filling. Easy fix and as it still needs to have bolt recesses added in so no wasted time really other then some time. With previously pre made flat plate, small pieces where cut and bonded in.

July 3  0.5hr
Sanded down all the fillers and bonding that was squished out. Lightly primed bare areas.

July 5
light skimmed over  some areas to cover up some valleys

July 7   2hr
sanded down and primed windshield trim.
ground down bolds on sill trim. Couple bolts got to worm or just did not bond properly as they are loose. Will have to either rebond them or glue them in so that they will not spin once upholstery is applied

Aug 1   0.5hr
Waxed and PVA windshield mold

Aug 20  0.5hr
found some old gel coat. had the top windshield trim coated so it will be like rest of the panels and be easier to sand if needed to give better finish

Aug 24   1.5hr
laid up fiber glass on windshield upper trim. will see how it will come out in next day or 2

Aug 25
pulled the windshield part from mold and came out very nice. Will just have to trim all the hanging sharp edges, wash it and sand it and trim it to final shape. 
Will have to make mold for headlight/lights/etc module and figure out how to make the surface that shows

Sep 1   2.5hr
trimmed windshield upper part. Will need to do some adjustments as it is tight fitting A pillars trim in.
trimmed lower windshield defrost filler, however most likely will have to rework it and re do it

sep 4  3hr
Mission headlights. The pain for last few years. Not exactly what the original plan was for them as far as mounts and location never the less its 99% of where they are going to be located. Had LED light buckers trimmed from last filling and made some further cutting on the bumper to sink them and making lenses flat with bumper and fenders. Not sure if there will be much of adjustment to the buckets to change angle of the light beams. most likely that will be done individually by projector.
Also cut off small corners on fenders and build up corners on fenders making a smooth cut line for headlights, fenders and bumper.
On next will be final finish of bumper to be remolded and finish of the HID and LED buckets both for molds and part making

Sep 7   3.5hr
Mission headlights II.  Some more tedious headlight adjustment but got the headlights both HID and LED adjusted to a point that can now finish bumper and remake the corners and finally finish the buckets for mounting projectors and making molds.
Had to also fix one of the tail lights to make up LED PCB template and bond both halves together
Started assembling and getting some initial code running for the HVAC controller

Sep 11   3hr
More work on HVAC controller. The go to libraries for multi function button does not work on the AT90CAN controller, not sure why exactly.  Looking around for alternatives but having problem with multi press options.

Sep 13  3hr
Worked more on HVAC controller. Got the basic LCD display running though layout will need to be redesigned depending on the available space in dash and display size in general.  Have all the logic buttons and indicators logic running. Need to add Mode.mixer motor control logic and blower speed added into the code.

Sep 15  1.5hr
back at headlight. Sanded down bumper and build up low spots. Sand down tail light and primed

Sep 16  2hr
Back at the lights again. Got the bumper to a point where it just needs clearance for light mounting locations and bolt dimples for fastening fenders to it and she will be ready to have corners redone.
Will need to get some fresh resin for the molds
Also not realizing but had printout of right rear LED PCB outline so it was waste of time fixing the clay plug and trying to make template for fixing the inside bucket. One thing that needs to be verified and should be mirror image to the left side

Sep 20  3hr
Working on HVAC LCD menu and temp sensors algorithm. Sun Level sensor for some reason is not working as expected. Need to work on biasing resistors which is most likely the cause of it.
Worked on some of the button logic as well switching system on/off and resuming to last settings.
Lastly ordered different larger LCD panel so maybe should not too much effort in UI layout. Ordered different LCD screen with larger aspect ratio in hopes for better layout. Meanwhile will continue working on temperature control subroutines.

Sep 22  4hr
Yes more head light work or more like bumper work. Now need to focus on headlight bucket, figure out mount points and any other clearances.
As change but still in same area moved onto tail light. It seems that when making inner buckets made the left one 1/8" smaller in couple spots  and did not go as wide and missing 1/4" in length. Not major issue but thinking of fixing it while everything is all bonded together. Had to clearance couple small spots.
Major step was drilling holes for bolts, making up metal plates, tapping it and bonding them in. Will have M6 studs screw into the holes and metal plates with help of thread lock which will act as fastening mechanism for the lights. Figured that will be best way of mounting .

Sep 29  2hr
More headlight work. Sanded down last skim of the bumper. Will have to prime it and leave it till headlight buckets are ready to see if there are any changes that need to be made.
Carved out inner parts of the LED headlight buckets to make it conical as it would not be possible to pull the projectors from molds. Most likely there will need to be metal bracket to hold the projectors to the buckets.

Oct 4   4hr
At the HVAC controller again. Added 1.8" 128x160 LCD display to the circuit and tried laying out how to display different values and what to display. Not crazy about the display format and most likely will change it to something different. Ordered some 1.9 170x320 displays which are narrower so may place them around the defrost panel rather then center console.
made up switch panel for various functions rather then using jumper wires as switches

Oct 12  4.5hr
Got the button libraries to work as hoped for. made up some rudimentary non blocking calls and the controller is responding nice and quick
Tried adding secondary mono LCD display to the circuit as alternative and not sure what is going on as the stand alone test code works with the AT90CAN microcontroller but once implemented into the bigger code it stops working all together.

Nov 10 3hr
made up cone forms for LED headlights for the projectors to fit in and not have to mess around squaring everything on the model. Figured that with the forms would be easier to build up the model quicker and since they are sloped it would be easy for the molds to be pulled out easier

Nov 28 1hr
Was thinking about how the headlight form will work. however after looking around came to conclusion that made them too long and its hard to properly test fit them so will have to most likely remake them with proper depth and see how the actual projector will fit.

Dec 28  4.5
found some logic flow issues how the buttons are functioning on the HVAC controller. Those are now fixed  Stability with original LCD seems to work as well. It may had something to do with reset pin on the LCD thought it should work without it. Lay leave it in in final circuit and at least in the schematic/pcb layout. May need that pin at later time. Will have to re-investigate it at later time.

Dec 30  6.5hr
got the mono LCD  display running. Not liking the library calls maybe that why had some issues with it originally. Though there was wiring issues as well. Some bloke can not read schematic and plug jumper wires on proto board correctly.
So since we had postal strike for the last 6 weeks and just before christmas they had been told to go back to work by labour board. Anyway the LCD had not arrived yet. though it had been 2 weeks since they are back at it though with holidays and back log of parcels my shipment had not arrived yet. So decided to re-order them from different seller, bit more expensive but hoping that they will show up faster. wrong logic but anyway.
Also got the I2C port expander running as it will be used to control mixer and mode motors. After some struggling to get couple of them running decided to go with a different one as there are specific libraries for controlling motor functions including rotational speed  which will be easier to implement through the library rather then trying to reinvent something that already is available. In either case. So ordered some new hardware and hopefully will be here soon.


 Total   1837. hr

 